Industrial Cooling Before & After HVLS Installation

Not projections. Not manufacturer claims. Documented results from actual HVLS installations in Vietnamese factories, warehouses, and logistics centres over three years.
HVLS at gym

Before & After HVLS

 ❌BEFORE HVLS

✔️AFTER HVLS

 Floor Temp 
36°C
Summer Afternoon

 Floor Temp 
29°C
Same Conditions

Energy Cost

$96K
Summer Afternoon

​Energy Cost​

$2.7K
HVLS Only

​Summer Output
-22%
vs Winter Baseline

Summer Output 
+18%
vs pre-HVLS summer
​

Noise
90dB

45 Traditional fans

Noise
52 dB
3 HVLS fans

01 — The Shift Experience

What a Summer Shift Looks Like — Before and After

The same 8-hour shift. The same building. The same team. The only variable: HVLS fans installed between these two seasons.

Before HVLS — Summer shift progression


7:00 AM

😐

30°C
Manageable. Floor still relatively cool from overnight.

4:00 PM

😵​

38°C
Second shift reluctant. Productivity floor –35% vs morning. Supervisors concerned.

1:00 PM

🥵​

37°C
Peak heat. Error rates climb. Heat stress incidents reported. Output –25%.


10:00 AM

😓​

34°C
Output slowing. Workers seeking shade. Break frequency increasing.

↓ HVLS INSTALLED ↓

After HVLS — Same season, next year


7:00 AM

😊​

27°C
Comfortable. HVLS already running. Good start.


4:00 AM

😊​

31°C
Second shift willing. Output within 5% of morning. Supervisors satisfied.


1:00 PM

😊​

30°C
Heat stress incidents: zero. Output steady. Lunch break normal duration.



10:00 AM

😊​

29°C
Peak performance maintained. No slowdown detected.


–7°C

 Peak temp reduction

at 1pm

+35%

Afternoon output

recovery

–75%

Heat stress incidents

reported

0
Early departures
due to heat

02 — Metric by Metric


Four Things That Change. Permanently.

Each metric measured before installation, then again after the first full summer of HVLS operation. All from Vietnamese industrial facilities, 8–12m ceiling height, 3,000–8,000m² floor area.

–7°C​    

Floor temperature reduction
Via destratification + evaporative cooling. No refrigeration. Equivalent to dropping setpoint 7 degrees with zero compressor energy.

–97%​   

Annual cooling energy costFor facilities replacing AC-primary with HVLS-primary. Hybrid approach (HVLS + reduced AC) delivers 40–60% savings.

+40%​   

Summer quarter output swing

The total swing from worst-case summer (before) to recovered summer (after). For 500 workers, this recovery is worth $500K–$2M in annual production value.


–38dB​  

Floor ambient noise

38 dB reduction on the logarithmic scale = 6,300× less sound intensity. Workers communicate normally.Hearing protection no longer mandatory.


03 — The Human Side

What Workers Report — After Installing HVLS

The numbers tell part of the story. This is the other part — direct feedback collected from floor workers 30 days after HVLS commissioning.

✓ After — Same Workers, 30 Days Post-Install

"I didn't believe it would make a difference. But the afternoon shift is actually comfortable now." ​

"The corner near the press is the same as everywhere else now. I don't notice a difference." ​

"I can hear my team clearly. We talk normally. That hasn't happened in years."

"I haven't taken an extra heat break all month. I didn't even realise it at first."

"No afternoon headaches this week, or last week. I think I was dehydrated before."

"I told my brother-in-law his factory should look into this. It's a real change."

Calculation Tool

Calculate ROI & Payback Period for Your Warehouse

Enter your warehouse parameters to receive a practical estimate of energy savings and payback period.

* Results are indicative. Precise advice requires site-specific warehouse data.

📊 Estimated Results
HVLS Fans Required
3 quạt

Annual Electricity Savings
73,6 triệu đồng
Current Electricity Cost / Year
100,3 triệu đồng

Payback Period
66 tháng
💡 Excludes additional benefits: labour productivity gains (+15–25%), reduced cargo losses, lower maintenance costs for old fans. Actual ROI may be 20–30% higher.

Hamilton Air HVLS Fan Line

Industrial Ceiling Fans HERO Series

Hamilton Air branded HVLS line – gearless PMSM motor, aerodynamic aluminium blades, IP55 to IP68 protection. Coverage from 600 m² to 2,000 m² per fan.

Hamilton Air · HVLS · PMSM

HERO-5 V300i

IP64 · 5-blade
Blade SpanØ 3.0 – 5.5m
Power0.37 – 0.75 kW
Coverage600 – 950 m²
Airflowup to 18,000 m³/h
Speed0 – 68 RPM
ProtectionIP64

Standard range – ideal for light manufacturing workshops, showrooms, supermarkets, sports halls. Gearless PMSM motor, VFD control, minimum ceiling height 3.5m.

View Details →
Hamilton Air · HVLS · PMSM

HERO-5 V200i

IP64 · Compact · 5-blade
Blade SpanØ 2.4 – 4.3m
Power0.18 – 0.55 kW
Coverage400 – 750 m²
Airflowup to 12,000 m³/h
Speed0 – 80 RPM
ProtectionIP64

Compact version – optimised for mid-size warehouses, workshops, schools. Minimum ceiling height 3.0m, lightweight, easy installation.

View Details →
Hamilton Air · HVLS · ADF

HERO-6 ADF

IP55 · 6-blade · ADF
Blade SpanØ 3.6 – 7.3m
Power0.55 – 1.5 kW
Coverage800 – 1.600 m²
Airflowup to 30,000 m³/h
Noise≤ 42 dB(A)
ProtectionIP55

ADF (Advanced Distributed Fan) technology – uniform airflow distribution, hot spot reduction. Optimised for shopping centres and mixed-use workshops.

View Details →
Hamilton Air · HVLS · Wet Rated

HERO-6 X Series

IP65 / IP68 · Wet Rated
Blade SpanØ 3.6 – 7.3m
Power0.55 – 1.5 kW
Coverage800 – 1.600 m²
IP RatingIP65 / IP68
Speed0 – 60 RPM
CertificationCE · UL · Food Grade

IP65/IP68 rated – unique on the Vietnam market. Stable operation under direct washdown: food factories, aquaculture, seafood processing.

View Details →
Hamilton Air · HVLS · Flagship

HERO-8 ADF

IP55 · 8-blade · Flagship
Blade SpanØ 5.5 – 7.3m
Power1.1 – 1.8 kW
Coverage1.200 – 2.000 m²
Airflowup to 42,000 m³/h
Speed0 – 55 RPM
ProtectionIP55

Flagship – 8-blade ADF up to 7.3m diameter. Maximum airflow for mega logistics warehouses, airports, exhibition centres and large sports arenas.

View Details →
HVLS Big Fans July 20, 2026
Share this post
Tags
Sign in to leave a comment
Understanding Airflow Coverage in Industrial Spaces
Dead zones, obstructions, wrong placement, and missing overlap — four things that turn a good fan into a disappointing one. Here's how to plan coverage that actually works.

HAMILTON AIR – SERVICES

CONTACT HAMILTON AIR

Zalo Chat Zalo Business WhatsApp WhatsApp Business Hotline Hotline 0915123860 Đặt Lịch Khảo Sát Đặt Lịch Khảo Sát Liên Hệ Tư Vấn Liên Hệ Tư Vấn