CO₂e Emissions — Cooling Only · 5,000m² Facility · Per Year
❌ Before HVLS — Industrial AC
432
tonnes CO₂e / year
300 kW × 8h × 300 days × 0.60 kgCO₂e/kWh
✓ After HVLS — 3 × HERO-5 V300i
13
tonnes CO₂e / year
9 kW × 8h × 300 days × 0.60 kgCO₂e/kWh

01 — Where Ventilation Carbon Sits
Cooling Is a Scope 2 Problem —
The Most Actionable Category
Scope 1, 2 and 3 emissions all require different strategies. Scope 2 electricity reduction is the fastest and most documentable lever for industrial facilities.
Scope 1 — Direct emissions
Combustion & Process
15%
Fuel combustion, process heat, fleet vehicles, refrigerant leaks. Requires process changes, fuel switching, or electrification to reduce.
- Boilers and furnaces
- Company vehicles
- Refrigerant leaks
★ Scope 2 — Purchased electricity
Cooling & Power
55%
Electricity purchased from the grid. Cooling is 48% of total electricity consumption — making ventilation the single largest Scope 2 lever for industrial facilities.
- Industrial AC / HVAC → HVLS replaces this
- Lighting → LED upgrade
- Production equipment → efficiency measures
Scope 3 — Value chain
Supply & Customers
30%
Purchased goods, logistics, employee commuting, product use and disposal. Requires supplier engagement programs and product lifecycle changes. Longest timeline to reduce.
- Raw material suppliers
- Inbound / outbound logistics
- Customer product use
02 — The Carbon Numbers
What Each Cooling Strategy Emits —
Per Year
The Carbon Arithmetic of HVLS
9 kW
HVLS total draw
3 fans · 5,000m
2,400h
Annual operating
8h/day · 300 days
×
×
0.60
Vietnam grid factor
kgCO₂e/kWh
=
12.96 tCO₂e
Annual emissions
vs 432 tCO₂e AC
The Vietnam electricity grid emission factor is 0.60 kgCO₂e/kWh (Ministry of Industry and Trade 2024 published value). This is the multiplier that converts every kWh saved into kilogrammes of avoided CO₂ equivalent — making energy reduction the most direct carbon action available to industrial facility managers today.
03 — Compliance Landscape
What Frameworks Require — and What HVLS Delivers
Three major frameworks now affect Vietnamese industrial manufacturers. Here's what each requires and how HVLS data satisfies it.
✓ Pass with HVLS data
EU CSRD Supply Chain
Effective 2026 for Vietnamese OEM suppliers
EU buyers require Scope 1–3 emissions reporting. Manufacturers must provide documented emissions data.
→ HVLS BACNET data satisfies this requirement
⚠ HVLS is one of required measures EU CSRD Supply Chain
Effective 2026 for Vietnamese OEM suppliers
EU buyers require Scope 1–3 emissions reporting. Manufacturers must provide documented emissions data.
→ HVLS BACNET data satisfies this requirement
✓ Pass with HVLS data
CDP / Science Based Targets
Annual reporting · SBTi net-zero pathway
CDP and SBTi require verified energy reduction data and CO₂ impact reporting.
→ Hamilton Air provides CDP-format energy reports
04 — The Numbers
What One Installation Delivers
Per 5,000m² facility · Annual figures · Three HERO-5 V300i fans
–419t
CO₂e avoided per year vs industrial AC baseline
90
Equivalent cars removed from the road annually
30 days
To audit-ready ESG report from commissioning date
–97%
Scope 2 reduction
cooling category
Our most selected products at Hamilton Air
Each model selected on four criteria: design, performance, durability and suitability for Vietnam's climate.
Minimalist Scandinavian wood blade fan — the #1 architect's choice for villas and premium apartments.
Energy-saving integrated LED ceiling fan — the optimal 2-in-1 solution for living rooms, restaurants and cafés.
Aerodynamic aluminium blades for premium commercial spaces, showrooms and hotel lobbies.
Large HVLS ceiling fan for commercial spaces. Strong airflow and quiet operation, ideal for resorts and garden restaurants.
Premium heritage-style wood blades — an interior statement piece for villa living rooms and European-style restaurants.
The most premium large-blade commercial fan — wide coverage, luxury design, BMS-ready with smart control.
Bắt đầu viết ở đây...