01 Project Background
BUV Ecopark — Where Campus Design
Meets Sustainable Infrastructure
The British University Vietnam (BUV) at British University Vietnam, located within Ecopark, required a ventilation solution capable of serving multiple campus environments, from large gathering spaces to quiet study areas. The facilities team sought a system that could deliver energy-efficient airflow, low operating noise, centralized control, and an appearance consistent with the university's modern architectural design.
Hamilton Air proposed a 22-unit deployment of 2.5m HVLS 7-blade BLDC fans, providing powerful air circulation with minimal energy consumption and noise. The system was designed for full BMS integration, enabling centralized monitoring and control across the campus. Coordinated with Sigma, installation was completed outside teaching hours to ensure uninterrupted academic activities and was successfully commissioned on schedule.

Reasons why BUV chose the 2.5m HVLS ceiling fan.
1. Energy saving
With a power consumption of only ~150W, the 2.5m HVLS fan can cool a space of 300–400 m², reducing the load on the central air conditioning system.
2. High airflow, no gusts
Ensures continuous air circulation, maintaining a comfortable feeling without excessive cold, suitable for learning and common activity spaces.
3. Quiet operation, no noise
Meets BUV's international educational environment standards.
4. Aesthetic design
Modern colors and style, harmonizing with Ecopark's green architecture.
02 Multi-Zone Deployment
Five Spaces. One Coherent
Campus-Wide Solution
The 22-unit HVLS fan system was strategically distributed across five key shared spaces at BUV Ecopark. Each area was evaluated based on ceiling height, occupancy levels, acoustic requirements, and airflow needs to ensure consistent air circulation and full coverage. All fans are connected to the campus BMS, enabling centralized monitoring and control.
01. Main Entrance Lobbies
Provide comfortable airflow in high-traffic arrival areas, with operation schedules aligned to peak campus entry periods.
02. Main Auditorium
Designed to deliver uniform airflow across large seating areas while maintaining a quiet environment for lectures, presentations, and events.
03. Library & Study Areas
Low-noise BLDC fans ensure a comfortable study environment, with adjustable speed settings managed through the BMS.
04. Student Common Areas
Support changing occupancy levels throughout the day, providing efficient airflow for social and collaborative spaces.
05. Internal Corridors & Gathering Spaces
Improve comfort in transitional areas by preventing heat buildup and maintaining gentle background air movement.
03 Project Photography
The Installation in Detail
From the structural reinforcement phase to final commissioning
1
Structural
Assessment
Engineers inspected and certified all mounting locations, completing any required structural reinforcement before installation.
2
Mounting & Suspension Installation
Custom brackets and drop rods were installed to position each fan at the optimal height for maximum airflow coverage.
3
Fan Assembly & Electrical Integration
The BLDC motors, controllers, and blades were installed, balanced, and tested to ensure smooth, vibration-free operation.
4
Testing & Commissioning
Airflow, noise levels, and system performance were verified before staff training and final project handover.
04 Sustainability Outcomes
Measured Results — Green Campus
Performance Confirmed
The BUV Ecopark project highlights how HVLS technology supports sustainable campus operations. The 22-fan system consumes just 1.85 kW in total while helping reduce air-conditioning demand and overall energy costs.
15–20%
AC Energy
Reduction
5–7°C
Perceived Temp
Reduction
1.85 kW
Total 22-Fan
Power Draw
<36 dB
Operating
Noise Level
05 Client Feedback